top of page

CivicLine Planning · Local Government

Application intake before the planner loses an afternoon.

CivicLine Planning pre-screens development packets for completeness, parcel constraints, and quantitative zoning checks. It cites the ordinance sections it relied on, drafts a staff-ready response, and routes the application to the right reviewers. The planner reviews, corrects, and signs.

7

Application types

6

Reviewer queues

0

Permit decisions by AI

How a packet moves

04

Route

To the planner, who interprets & signs.

03

Draft

Staff-ready findings, sources attached.

01

Check

Completeness and parcel constraints.

02

Calculate

Cited zoning math, by ordinance §.

Application Types

Seven types of applications.

Each application type has its own checklist, zoning math, and reviewer path. CivicLine Planning gives staff a repeatable first pass: missing packet items, cited calculations, parcel constraints, and the issues that need planner judgment.

Type 01

Building permit

New construction, additions, alterations. Checks setback, height, FAR, lot coverage, and parking against the underlying zoning district.

Routes: Planner · Building Official

Type 05

Site plan

Full site plan review. Setbacks, parking, landscape, stormwater, access, sight distance, signage. Heavy checklist.

Routes: Planner · Engineer · Fire

Type 02

Zoning variance

Departures from the standards. Identifies which standards the request varies from and the unique-hardship facts that have to support it.

Routes: Planner · BZA

Type 06

Special use

Use-specific approval. Surfaces the underlying standards in the special-use article that apply to the proposed use.

Routes: Planner · Council

Type 03

Conditional use

Uses permitted by condition. Checks the use against the table of conditional uses for the district; lists the applicable conditions.

Routes: Planner · Commission

Type 07

Demolition

Demolition permits. Flags historic-district overlays, asbestos certification, and abandonment-of-use considerations.

Routes: Building Official · Historic

Type 04

Subdivision

Lot splits, plats. Runs minimum lot size, frontage, and access checks; identifies which exhibits the application is missing.

Routes: Planner · Engineer

More

Other types

Need a type that isn't here? The checklist engine can be configured to your jurisdiction's needs.

.

What It Checks

Mostly math.
Not mostly AI.

CivicLine Planning leans on the language model as little as possible. Setback distances, FAR calculations, parcel overlays — all deterministic, all citable, all reproducible. The LLM writes the letter; it doesn't decide the outcome.

Deterministic · Reproducible · Citable

What runs by rule.

These checks run as code against your published municipal code. Same inputs, same outputs, every time. Every check returns the ordinance section it relied on.

Checklist completeness — what the packet must include, what's missing

Setbacks — front, side, rear, against the district minimums

Floor Area Ratio (FAR) — computed against the lot area

Height — proposed vs. district maximum

Lot coverage — impervious surface, building footprint

Parking — required spaces vs. proposed, by use category

Parcel constraints — zoning, overlays, floodplain, historic, easements

Internal inconsistencies — narrative vs. drawings, drawings vs. exhibits

Every check carries an ordinance citation. If a check returns "needs human," the citation explains why the deterministic check couldn't conclude.

Where the LLM helps

What runs by language.

Two narrow jobs for the model:

The response letter — turns the structured findings into the prose your office actually sends. Tone matches your state-level policy pack.

Routing rationale — one or two sentences per reviewer queue, explaining why this application needs that desk's attention.

Both outputs are reviewed by a planner before sending. The agent doesn't decide; the agent drafts.

Routing

Six desks.

Every applicable check tags itself with the reviewer desk it requires. The agent aggregates the tags and routes a single application to as many or as few queues as the work actually demands.

Queue 01

Planner

The lead reviewer. Owns zoning compliance, use determination, and the overall pre-screening output. Sees every application.

Queue 04

Fire Marshal

Access, hydrant coverage, suppression requirements. Sees site plans and special-use applications with assembly occupancy.

Queue 02

Engineer

Site plan engineering, drainage, sight distance, public infrastructure impact. Sees site plans and subdivisions.

Queue 05

Environmental

Wetlands, stormwater, tree preservation, environmental overlays. Triggered by parcel constraints in the deterministic pass.

Queue 03

Building Official

Code compliance, occupancy, structural prerequisites. Sees building permits and demolitions.

 

Queue 06

Historic

Historic-district review. Triggered automatically when the parcel sits within a historic overlay; sees demolitions and exterior alterations.

Boundaries

The agent doesn't decide.

Permit decisions belong to planners and elected bodies, not to AI. Everything CivicLine Planning produces is a recommendation for human review.

01

Never issues a permit decision.

The output is always a staff aid: complete, incomplete, or needs planner review. It does not recommend approval or denial. It prepares the record for a planner who owns the call.

03

Stateless.

CivicLine Chat is hard-limited to the citizen-tier toolset. Internal personnel records, draft FOIA responses, pre-decisional emails — none of it is reachable from this surface.

02

Every zoning check requires a citation.

The check field for an ordinance citation is not optional. If the system can't cite an authority, the check returns needs human. Ambiguity is surfaced, not hidden.

04

No external GIS calls.

Parcel constraints (zoning, overlays, floodplain, historic, easements) are pre-fetched by the caller and passed in. The agent doesn't reach out to your GIS during the run; the source of truth stays where it should.

Sample Analysis

One application, end to end.

Below is the structured output for a sample building-permit application in a C-1 commercial district. The agent ran the pre-screen, cited the sources, and flagged what needs attention. It did not recommend approval or denial.

Get Started / Contact Us

Twenty minutes. Pre-screen a real packet.

Bring a recent application — or use our data. We'll show exactly what the system can check, what it refuses to decide, and where staff judgment stays central.

bottom of page